Key projects

No.

DGC’s title

Number of projects, pcs.

Capacities MVA, km

1

“Vladimirenergo” branch

2

63 MVA/16

2

“Kalugaenergo” branch

2

25MVA/7.22 km

3

“Kirovenergo” branch

2

20MVA/3.61km

4

“Marienergo” branch

1

-

5

“Nizhnovenergo” branch

2

25 MVA

6

“Ryazanenergo” branch

1

63MVA

7

“Tulenergo” branch

2

40MVA/18.1

8

“Udmurtenergo” branch

1

-

Timely replacement of the obsolete and worn-out equipment reducing the power supply reliability rates;

  • Replacement of the equipment with parameters not complying with grid requirements in dynamic and thermal stability, safety, etc.;
  • Increasing grid operability (power supply reliability) and manageability;
  • Improvement of the received and delivered power quantity and quality accounting system;
  • Susceptibility (adaptation) to the growing electric loads, usage of fresh automation appliances, new service technologies;
  • Power and environmental safety;
  • Replacement of obsolete relay protection and automation systems (devices);
  • Reactive power management in electric grids;
  • Increasing distribution grid throughput, and power reserve generation for grid connection of the consumers;
  • Measures in connecting privileged consumer groups.

Information on the Investment Program of IDGC of Center and Volga Region, JSC, for 2016

No.

Structure of the Investment Program for 2014

Financing, mln. RUR

1

Construction and reconstruction of the 35-110 kV PTL

265.6

2

Construction and reconstruction of the 35-110 kV SS

1309.5

3

Construction and reconstruction of the 0.4—6-20 kV Distribution Grid

2095.4

4

Means of accounting and control of electric power

177.9

5

Automation, communication, dispatch control

301.2

6

Measures to connect privileged consumer groups

2254.6