Key projects

No

DGC name

Number of projects, pcs.

Capacity,
MVA, km

1

branch “Vladimirenergo”

3

6.3 MVA/13.428 km

2

branch “Ivenergo”

2

32 MVA /0.88 km

3

branch “Kalugaenergo”

1

-

4

branch “Kirovenergo”

1

20 MVA

5

branch “Marienergo”

1

-

6

branch “Nizhnovenergo”

2

-

7

branch “Ryazanenergo”

3

32 MVA/28.373 km

8

branch “Tulenergo”

3

28.93 km

9

branch “Udmurtenergo”

2

6.3 MVA/34.4 km

  • timely replacement of obsolescent and deteriorated equipment which reduces indices of electricity supply reliability;
  • replacement of the equipment having the parameters which do not meet the requirements of the grid as to transient and thermal stability, safety, etc.;
  • improvement of grids survivability (electricity supply reliability) and their manageability;
  • improvement of the system of metering quantity and quality of received and transmitted energy;
  • sensitivity (adaptation) to growing electrical loads, use of new automation tools, new technologies of maintenance;
  • electrical and ecological safety;
  • replacement of outdated systems (instruments) of relay protection and automation;
  • jet power control in electric grids;
  • enhancement of transmission capacity of the distribution grid and creation of the capacity reserve for grid connection of consumers;
  • actions aimed to connect privileged groups of consumers.

Information on the 2017 Investment Program of IDGC of Center and Volga Region, PJSC.

No

2017 IP Structure

Funding, mn of RUR

1

Construction and reconstruction of PL (power lines) 35-110 kV

686.0

2

Construction and reconstruction of S (substations) 35-110 kV

1,743.7

3

Construction and reconstruction of distribution grid 0.4-6-20 kV (including grid connection)

2,996.9

4

Electricity metering and control tools

357.0

5

Automation, communication, dispatch control

366.0

6

Actions aimed to connect privileged groups of consumers

2,739.7